The first step flashing will be behind the rake metal and notched to slide under the upper shingle.
Shingle to metal roof transition detail.
Easy to do hard to explain.
The most trusted miami roofing contractor professionally describes the installation of thi.
String the line along the top of the frame until it meets the shingle roof.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
However if you follow this guide properly we re sure you can do it too.
Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
The roof plane goes from one pitch to a lower pitch.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
If you look here at the lower slope roof you can see that we ve already put panel on it and installed z trim as we have been doing elsewhere on this project.
Our 7 step guide of shingle to metal roof transition will cover everything you need to know about from the pros and cons of metal roofs to proper installation.
This video shows the transition of a shingle roof to a metal roof.
The piece that s going to allow us to join the panels on the lower slope and the panels on the higher slope is the pitch transition flashing or the pitch change trim.
Your shingle to metal roof transition should be a run of about 16 flashing metal with closures on the metal roof.
Although installing a metal roof can be a bit of work.
This is a fairly common roof detail.
Your rake will be notched and run under this flashing and be cut to fit the slope of the lowe roof.
Jun 14 2016 sean jarboe.
A roof pitch transition is a line in the roof plane that changes pitch.
We see this quite frequently in log home roofs with porches for example.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.
Pitch transitions are a common roof detail.