I ve done a few 4x8 planks with screws at that frequency.
Screws per sheet of sub floor.
Use 6d common nails spaced 6 apart on edges and 12 apart in the field.
Be sure the joists are dry and free of dirt before applying.
According to table r602 3 1 of international residential code irc subfloor fastener schedule is as follows.
The screw count is a bit high at times but this will allow for losing some.
Man that s a lot of screws.
The first two of these come with a nice yellow zinc finish while the hillman group screws are unassuming yet tough in basic black.
The floor looks like the skin of an airplane with so many screws around the perimeter.
I ve read for nailing the underlayment to do one nail every foot in the interior of the plywood and around the perimeter at 2.
Place the first sheet over the mortar bed.
Am i on the right track.
The rough or embossed surface of the sheet should face up as applicable.
Use a solvent based glue that meets astm d3498 performance standards.
Drive the screws in so that the heads are slightly below the surface of the backerboard sheet.
Fasten the sheet with cement board screws using a drill driver making sure the screws are flush with the surface of the sheet or are slightly recessed.
Nail spacing for sheets of osb and plywood is 8 inches per nail.
This means that you ll need to use six nails per each truss that runs under the sheathing because each sheet measures 4 feet wide by 8 feet long.
Allow a 1 4 inch gap between the edges of he sheets and all surrounding walls.
Position the screws at least 1 2 inch but no more than 2 inches from the edge of the sheet.
This simple sub floor materials calculator will provide you with the lineal feet of floor joist needed the number of sheaths to cover the floor and how much glue and how many screws it takes to attach the sheathing to the joist.
Apply glue per manufacturer s specifications.
In cases where latex subfloor glue is required careful selection is necessary due to the wide range of performance between brands.